Core-hole drilling and surface preparation
Wetherill Park Warehouse Make-Good
A warehouse floor in Wetherill Park containing approximately 1400 bolts required us to core drill them out and then epoxy the holes. Additionally the job also involved an internal strip out of the adjoining office.
Wetherill Park Warehouse Make-Good